Work was work. Making progress on deploying services to production. Interviewed another sysadmin. Fixed some other things.
Came home and worked on the sunroom. Got a bunch of stuff out of the Study (and back into the Library).. emptied out the dresser that was holding various gardening and painting supplies into a box, and moved the dressed out onto the deck. If you want a dresser, speak up. It was a four-drawer, but was converted to a three-drawer after an internal structural failure.
Got some boxes that need to go to the basement.. but the basement is a mess and needs to have stuff reorganized and taken to storage..
Apparently the fair is this weekend. But so is concom, which I've missed the past.. several. So I need to go. Ah well.
Came home and worked on the sunroom. Got a bunch of stuff out of the Study (and back into the Library).. emptied out the dresser that was holding various gardening and painting supplies into a box, and moved the dressed out onto the deck. If you want a dresser, speak up. It was a four-drawer, but was converted to a three-drawer after an internal structural failure.
Got some boxes that need to go to the basement.. but the basement is a mess and needs to have stuff reorganized and taken to storage..
Apparently the fair is this weekend. But so is concom, which I've missed the past.. several. So I need to go. Ah well.